When Cascade Control Isn’t the Right Solution
Previous posts covered the fundamentals of Cascade Control along with a comparison of the Pros and Cons associated with applying this advanced control strategy. This post takes a contrarian’s view – the philosophy of ‘no’. It offers reasons for eliminating Cascade Control as an option for improving process performance if only to postpone other difficult questions related to ROI.
Before delving into the economic benefits of Cascade Control, start by considering the following:
- Secondary Variable
Lacking a secondary process variable that influences the primary control loop is a non-starter for implementing Cascade Control.
The secondary control loop provides the much-needed early warning variable to an otherwise slow process. Through its influence on the control of a given process the secondary control loop speeds the response to disturbances. Without access to such a secondary variable Cascade Control is not an option.
- Faster Dynamics
If the secondary variable isn’t notably faster than its primary counterpart, then there is no performance gain to be realized.
A fundamental challenge of the primary control loop is its slow behavior whether due to an excessively large Time Constant and/or Dead-Time value. In order to accelerate the process’ ability to correct for disturbances the secondary loop must offer a speedier response. In fact, the secondary loop must have dynamics that are at least 3-5 times faster than those of the primary loop.
- Shared Resource
Look elsewhere if the secondary variable doesn’t share the same Final Control Element (FCE) that’s used by the primary loop.
In order to function properly the secondary control loop in a Cascade Control schema needs to be nested within the primary loop. While that secondary loop takes the lead in responding to disturbances by adjusting the FCE, the primary loop still makes meaningful adjustments as well.
If the answer to any of the three (3) criteria outlined above is ‘no’, then Cascade Control is not an option.
However, if each answer is ‘yes’, then it would be worthwhile to perform an economic assessment of applying this advanced control strategy.
Share this post:
Our most popular posts:
Expand your knowledge with this featured publication:
Break the Rules: A Hybrid Approach for Tuning Very Slow Processes
Practitioners of every age know that tuning very slow processes presents a challenge when faced with rigid time constraints. Specifically...
Learn moreStay up to date. Sign up for our newsletter:
These resources offer related content:

Making Our Mark on Automation

What Value is Hidden in a Plant’s Process Data